NDDS’ Assessment team will perform the Phase II in accordance with ASTM E1903-11 Standard Guide for Environmental Site Assessments: Phase II Environmental Site Assessment Process. This assessment includes the entire scope of work in the Phase I, and also includes a physical collection sample and analytical confirmation of suspect contaminants such as:
- Soil Investigations
- Water Sampling/Quality
- Above ground and under ground storage tank testing
- Hazardous materials identification and testing
- Asbestos
- Mold
- Lead-based Paint
- Radon and More